top of page

PROJECTS

PROJEK MENAIKTARAF KG LOMBONG, DAERAH KLANG, SELANGOR

KERJA-KERJA MENANAM CABLE PIT

WhatsApp Image 2021-01-04 at 11.57.17 AM
WhatsApp Image 2020-12-27 at 4.15.29 PM.
WhatsApp Image 2020-12-27 at 5.01.12 PM.
WhatsApp Image 2021-01-07 at 3.09.19 AM.

KERJA-KERJA PENGALIHAN TIANG TRAFFIC LIGHT & BODY ASPECTS

WhatsApp Image 2021-01-01 at 8.52.52 AM.
WhatsApp Image 2020-12-27 at 5.42.45 PM.
WhatsApp Image 2020-12-26 at 1.46.48 AM.
WhatsApp Image 2021-01-04 at 11.57.14 AM

KERJA-KERJA PEMERIKSAAN KEROSAKAN PADA SISTEM CONTROLLER

WhatsApp Image 2020-11-27 at 10.13.02 AM
WhatsApp Image 2020-11-27 at 10.13.02 AM

PROJEK MAJLIS BANDARAYA JOHOR BAHRU

KERJA-KERJA MEMBEKAL PEDESTRIAN TOUCH SENSOR WITH INFARED (IR) DAN ROAD STUDS DI LINTASAN PEJALAN KAKI JALAN IBRAHIM, JOHOR

WhatsApp Image 2021-01-04 at 11.43.17 AM
WhatsApp Image 2021-01-04 at 1.02.00 PM.
WhatsApp Image 2021-01-13 at 1.23.52 AM.
WhatsApp Image 2021-01-13 at 6.09.00 AM.
WhatsApp Image 2021-01-13 at 6.09.24 AM.

PROJEK SA46 SHAH ALAM

KERJA-KERJA MENGGANTI KABEL LAMPU ISYARAT DAN KERJA-KERJA YANG BERKAITAN DI SIMPANG SA46, PERSIARAN K.LANGAT, JLN PANGLIMA GARANG 28/1, SEKSYEN 28, SHAH ALAM UNTUK MAJLIS BANDARAYA SHAH ALAM

WhatsApp Image 2020-11-21 at 10.41.50 AM
WhatsApp Image 2020-11-21 at 4.41.29 PM
WhatsApp Image 2020-11-21 at 10.41.49 AM
WhatsApp Image 2020-11-21 at 4.41.27 PM
WhatsApp Image 2020-11-22 at 3.33.32 PM
WhatsApp Image 2020-11-22 at 3.33.37 PM.
  • Facebook
  • Whatsapp
  • Instagram
  • Twitter
  • vecteezy_gmail-logotype-flat-vector-illustration_9911504
bottom of page